Case Studies

Real roofs. Real numbers. Real warranties.

A sample of the commercial roof restoration projects we scope. Each one shows the system specified, warranty tier, total investment, and the baseline estimate it replaced.

Note: The case studies below are representative sample projects illustrating the type of work we scope and the typical outcome profile. As projects complete, we are adding real field documentation and photography here — check back or request references directly.
Sample · Warehouse

42,000 SF distribution facility

Location
Central Indiana
System
Hybrid (acrylic + silicone)
Warranty
15-year GAF HydroStop
Timeline
9 working days
Existing Roof
22-year-old TPO
Replacement Bid
$540,000

Facility manager received a tear-off proposal from an incumbent contractor. Our inspection confirmed dry insulation (moisture scan) and sound decking. Hybrid system restored roof with a registered 15-year warranty at a fraction of the replacement bid — building remained operational throughout install.

Sample · Retail Center

18,500 SF single-tenant retail

Location
Central Illinois
System
Acrylic base + top
Warranty
10-year GAF HydroStop
Timeline
4 working days
Existing Roof
14-year-old Modified Bitumen
Replacement Bid
$220,000

Owner-operated retail building with a 3-year hold horizon. A 10-year acrylic system was the right specification for the hold period and budget — restoring waterproofing and warranty without over-spending on a 20-year tier.

Sample · Office / Medical

31,200 SF medical office park

Location
Central Florida
System
100% silicone top coat
Warranty
20-year GAF HydroStop
Timeline
8 working days
Existing Roof
18-year-old Modified Bitumen
Replacement Bid
$420,000

REIT-owned multi-tenant medical property. Silicone system specified for ponding-water tolerance and long-term hold. 20-year warranty registered in the ownership entity's name, transferable at sale. Install executed on weekends and after-hours to avoid tenant disruption.

Sample · Mfg / Industrial

84,000 SF metal-roof manufacturing plant

Location
Northern Illinois
System
Silicone on metal
Warranty
15-year GAF HydroStop
Timeline
14 working days
Existing Roof
28-year-old R-Panel metal
Replacement Bid
$860,000

Active 24/7 production facility where tear-off was non-viable. Coating strategy: rust stabilization, fastener re-seal, seam reinforcement, 15-year silicone top coat. Zero production hours lost. Reflective white finish also reduced interior cooling load.

Want references for your building type?

We can share project documentation and connect you with owners of similar properties. Start with a free assessment.

Request Free Assessment
Tap to Call · 480-297-5715